Archive for the ‘Military Procurement’ Category

Page 4 of 41234

On the Army’s effectiveness testing of body armor for the troops, a 2009 GAO report concluded: “Overall reliability and repeatability of the test results are uncertain.” To that, Army Brig. Gen. Peter N. Fuller, Program Executive Officer of the Soldier Systems Center at Ft. Belvoir said:

“The challenge we are having with this GAO audit report is they are challenging our processes, and I think what we are really identifying is we have had an evolution of processes and we need to better articulate what we are doing there.”

He has insulted men of valor and action with empty words.

BG Fuller said that despite the GAO finding irregularities in body armor testing, “We have the best body armor by far.” He added that he appreciated the GAO because it helped the Army insure that the troops get the “very best.”

Without responding to the GAO report’s findings, Gen. Fuller had preemptively framed the issue as a failure to communicate, not a real problem with testing.

Then he asserted that the body armor was the best.

Were that true, why would the House Armed Services Committee have published these words in its 2010 FY National Defense Authorization Act Summary?

Body Armor

The committee requires DOD to establish specific budget line items within the procurement and research, development, test and evaluation (RDT&E) accounts for body armor. This will improve accountability and increase transparency into long-term investment strategies as well as facilitate the advancement of lighter-weight technologies. Additionally, the committee strongly encourages the standardization of the requirements and test and evaluation processes for body armor. (p. 24)

The Committee’s directive clearly implied that accountability and transparency in body armor testing, in evaluation, and in contracting fail to meet appropriate standards.

Now read this gem in the same report, which really hits home considering the above statement of the House’s expectation that Gen. Fuller act, not just speak on the issue:

Prohibition Relating to Propaganda

The committee prohibits DOD from engaging in propaganda activities except as otherwise authorized by law. The term “propaganda” includes materials such as editorials or other articles prepared by an agency or its contractors at the behest of the agency and circulated as the position of parties outside the agency. (p. 46).

The prohibition could include assertions of unverified facts about body armor safety made by Brig. Gen. Fuller on Army.mil that appear to agree with proprietary claims of existing body armor contractors. Such statements raise serious questions about the objectivity of the testing processes.

The Soldier Center took another hit for failing to insure quality control on the testing of helmets, according to a CNN report in May. The Department of Justice had to inform the Pentagon that Armor Source, LLC, the helmet contractor, was under investigation for violating standards for making helmets withstand ballistics. In an Army ballistics re-test of the helmets, the helmets failed and 44,000 were recalled.

But, it was another recent example of poor Pentagon oversight of its suppliers that caused me to review the body armor and helmet procurement problems. While reviewing press on the rare earth element and trade imbroglio heating up between China and the West this week, I found a classic quote about the Pentagon’s procurement awareness. Christine Parthemore, fellow at the Center for a New American Security, told the Washington Independent’s Andrew Restuccia, “In defense equipment, because stuff is manufactured by the private sector, and [the private sector] is not involved in the end-use of these products. … There’s sort of a detachment of information that happens..”
Parthemore was explaining that the US military had “very little sense” of its own dependence on rare earth minerals used in its most sensitive smart weapons, guidance and communications systems because the metals’ usage is proprietary information.

Considering the context, a Chinese monopoly on magnetic components that help provide the “shock & awe” for which the US military is renowned, Parthemore’s observation suggests that the Pentagon will sacrifice national security to protect corporate privacy, even if the corporations are state-owned Chinese firms or their agents!!!

In response, the 2010 Pentagon scratches its collective head and effectively says, ‘We didn’t know that was a national security issue; let’s study our dependence on rare earths.’ This is despite Deng Xiaopeng’s famous boast that China would use its leverage in rare earths against the West’s domination in oil.

Rare metal supply is a troop safety issue too, since magnets manufactured from rare earths make bombs smart enough to miss friendly forces during air support to ground troops.

Is there really a ‘detachment of information’ because the Pentagon wants to honor the proprietary secrets of its contractors? Or is there collusion with contractors to keep proprietary vulnerabilities a secret? Such facts beg for DOJ probes into possible illegal influences between procurement officials and contractors. Perhaps these security problems may be deterred in the future by putting dishonest and corrupt officials in jail.

Michael Woodson
Contributing Editor
Note from SFTT Editor:  SFTT is thankful to the vigilant Michael Woodson for bringing this information to our attention. The GAO and other other investigative bodies have unearthed many examples of flawed test procedures and an unhealthy relationship between private contractors and military officials responsible for the procurement of protective gear and combat equipment for our troops.  It is patently clear to all who have followed this bizarre and incomprehensible display of Beltway spin that the “Emperor has no clothes!”  When will there be sufficient public outrage to bring this seriously flawed and possibly corrupt military procurement process and incestuous relationship between procurment officials and their suppliers to an end.  Support SFTT and help to bring light to the shoddy and shady processes that appear so ingrained in our military procurement system. The lives of our brave young men and women who serve in harm’s way may very well depend on it.

In a delightful article published by Huffington Post entitled “Pentagon’s New Contractor Policy Doesn’t Scare the Defense Industry At All,” Huffington’s editors sadly conclude that recently announced measures to improve the efficiency of the military’s procurement process are likely to produce little more than a yawn from contractors who have long thrived on the ineptitude of the Defense Department.

Ashton_CarterIn a June 28th Memorandum for Acquisition Professionals, Defense Department Acquisition Chief Ashton B. Carter,, calls for military suppliers to ”. . . abandon inefficient practices accumulated in a period of budget growth and learn to manage defense dollars in a manner that is, to quote Secretary Gates . . .’is respectful of the American taxpayer at a time of economic and fiscal distress.’”   I  assume that most American taxpayers would be incensed to discover that military spending profligacy needs to be curtailed only during periods of “fiscal distress.”  This seems to be a damning indictment of the questionable and most likely corrupt procurement practices that are now so firmly entrenched at the Pentagon. 

Huffington Post goes on to say, ”it’s a testament to how corrupt the now $400 billion a year contracting process has become that the changes outlined Monday seem in any way dramatic; they are, mostly, simple assertions of common sense. Among the new policies, as summarized by me (Huffington Post):

  •  Cut down on awarding contracts without genuine competition.
  • Cut down on contracts in which government pays for all or part of cost overruns.
  • Reward higher productivity, innovation and excellence, rather than other things.
  • Get credit for government’s generous cash-flow policies.
  • Eliminate valueless overhead and administrative fees; for instance, don’t pay contractors’ bidding and proposal expenses when there was no bidding.
  • Add more and better government acquisition workers.
  • Improve audits.
  • Let cost considerations shape requirements and design for new programs such as the presidential helicopter, the ground combat vehicle and the new nuclear submarine fleet.
  • Don’t allow contractors to reduce production rates without approval.”

Our troops in the field are painfully aware of the inadequacies of our military procurement process as evidenced by the improper testing of body armor, the recent recall of military helmets and ceramic plates, the inability of the Defense Department to supply replacement parts for the M2 heavy duty machine gun and the reported ineffectivness of the M4 in Afghanistan.   If the Defense Department really wanted to show the taxpayers and military contractors that they mean business, the should begin by firing government employees whose oversights and/or indiscretions are responsible for those failures and ban military suppliers from bidding on new contracts where neglect has been shown as reported by the DODIG or GAO. 

Mr. Carter’s soft memo to “Acquisition Professionals,” is the equivalent of giving prison inmates a copy of Emily Post’s book on Etiquette.  The military industrial complex is alive and well and thriving at taxpayer expense and in the blood of our young men and women serving in harm’s way.

General James CartwrightIn a refreshing but somewhat rambling presentation, Vice Chairman of the Joint Chiefs of Staff, USMC General Cartwright, suggests diverting money from high-tech military procurement programs to give our troops the proper combat equipment to fight the “low-end wars” that we are in for the “next five to ten years.”  In an article published in the Army Times, staff editor John Bennett writes that General Cartwright said that “there is nothing out there that tells us we won’t be wrapped up in these conflicts for as far as the eye can see.”  His remarks were at a sponsored forum at the Center for Strategic and International Studies.

Echoing a message that seems to be coming from many quarters both inside and outside the Capital beltway, General Cartwright argue that the  US military will be “persistently” wrapped up low-level regional conflicts such as Afghanistan and Iraq “in different places and at different levels” for the foreseeable future.  Citing Secretary Gates, General Cartwright stated that if the DoD “continues pursuing expensive weapons packed with countless advanced subsystems, it will be able to afford only a handful of each platform.”  Furthermore, he argued that the current economic environment placed a serious constraint on military spending.

Calling for a greater “partnership” with our allies, General Cartwright suggested that the men and women in the field will play a far greater role in these conflicts.  “The question is, how many bomber squadrons do we need versus how many troops expert at stability operations,” said Cartwright.  “We need quantity more than quality.”  If this is, in fact, the new military doctrine of engagement then it seems reasonable to expect that greater attention will be focused on make sure the grunt on the ground has the best equipment possible.  Certainly, this is long overdue given the attention now focused on the poor quality of our body armor and more recently, the failings of the M-4 rifle.

Page 4 of 41234

Share a story

Whether you are on active duty or retired, a friend or family member we encourage you to share your story. As proud Americans we salute our heroes and thank you for your courage and sacrifice. We want to hear from you and so do our readers.

Stay informed: latest news and stories

We respect your email privacy

Thank you for signing up! An email will be sent to the address you provided, asking you to confirm your sign up.

News & Announcements

Our Story

photo of a soldierStand For The Troops (“SFTT”) is a 501(c)(3) non-profit Educational Foundation established by the late Col. David H. Hackworth and his wife Eilhys England to insure that our frontline troops have the best available leadership, equipment and training.

In the past four-plus years SFTT'S active campaign has focused on ensuring America's frontline troops get the best available individual protective equipment and combat gear.

Donations and contributions from concerned Americans help fund the SFTT website.

Hackworth Memorial DVD

photo of HackworthIncludes rare footage from Hack's memorial service at Fort Myers Chapel and burial in Arlington National Cemetery.
All donations received from purchasing of The Hackworth Memorial DVD go to Stand For The Troops a 501 (c) 3 non-profit, non-partisan apolitical foundation established by Hack and his wife Eilhys to make sure that America's front-line forces—the kids Hack loved out at the tip of the spear—always have the right training, leadership and equipment to meet their assigned missions and make it home alive and in one piece.

Our Campaigns

  • December 23, 2009: The law firm of Kirkland & Ellis LLP filed the final motion with the Federal Court in Washington, DC in the Freedom of Information Act (“FOIA”) on behalf of the SFTT’s editor for forensic records held by the Department of Defense (“DOD”).
  • October 16, 2009: The Government Accountability Office (“GAO”) issues report to Congress calling for “independent expert assessment of Army body armor test results.” This damning report of US Army body armor test procedures is the outgrowth of a two-year investigative and educational campaign by SFTT to seek fair and impartial test procedures.

Get Involved

  • RSS feed
    Subscribe to our RSS feed
  • YouTube
    Watch our videos
  • Flickr
    See our photos