GAO Recommendations on Body Armor Testing

To determine what effect, if any, the problems GAO observed had on the test data and on the outcomes of First Article Testing, the Army should provide for an independent ballistics evaluation of the First Article Testing results by ballistics and statistical experts external to the Department of Defense before any armor is fielded to soldiers under this contract solicitation. Because DOD did not concur with this recommendation, GAO added a matter for congressional consideration to ...

Continue Reading →

Body Armor Testing: What the GAO found

During Preliminary Design Model testing the Army took significant steps to run a controlled test and maintain consistency throughout the process, but the Army did not always follow established testing protocols and, as a result, did not achieve its intended test objective of determining as a basis for awarding contracts which designs met performance requirements.

In the most consequential of the Army’s deviations from testing protocols, the Army testers incorrectly measured the amount of force absorbed by the plate ...

Continue Reading →

Why the GAO Study on Body Armor Testing?

The Army has issued soldiers in Iraq and Afghanistan personal body armor, comprising an outer protective vest and ceramic plate inserts.   The Government Accountability Office (“GAO”) observed Preliminary Design Model testing of new plate designs, which resulted in the Army’s awarding contracts in September 2008 valued at a total of over $8 billion to vendors of the designs that passed that testing.

Between November and December 2008, the Army conducted further testing, called First Article Testing, on these designs. ...